Completed yacht restoration projects

Restoration of yacht 'Hygeia of Halsa'

'HYGEIA OF HALSA'
Halberg Rassey 42e
42ft
1988

New traditionally cut teak decks.
Awlgrip paint system on hull and cockpit.

This gallery shows the restoration of the yacht Hygeia of Halsa. Click on any of the thumbnail images for Slide Show.

New decks being laid on Saba teak adhesive and fixed with screws New teak decking being laid on GRP sandwich All fixing holes plugged with teak dowels
Priming and caulking the seams All fixing holes plugged with teak dowels Cockpit area, filled, faired and ready for primer
Decks have a final sand and all fittings fixed on sealant New standard Hallberg Rassey hatches throughout Dorade vents re-painted and new hatch vent
Cockpit and hatch surrounds painted with AwlGrip Original teak gunwales cleaned up and treated with teak oil Aft deck teak decking
Foredeck teak decking Side deck teak decking Old deck fittings are re-plated
New aft deck teak seats New teak gratings for bathing platform and teak treads Hand painted AwlGrip paint system
  Hand painted AwlGrip paint system  
top of page